Sandyfreund

(2004 VP59 )
#
NOW @ 13 CAP 8

Discovery Chart

9.11.2004 00:00 Catalina 110w44 32n25 observations 1


<< prev in category - Long names - next in category >>

Sandy Freund (b. 1979) is the flight system Fault Protection Lead and Launch and SRC Release Mission Phase lead at Lockheed Martin on the OSIRIS-REx Mission. She was the fault protection lead on MAVEN and was a mission operations development lead on the Phoenix Mission's EDL critical mission phase.


Discovered on 9-11-2004 in Catalina by CSS

ORBITS | AstDys | Wikipedia | Dictionary | UrbanDictionary | Bartleby | Webster | Name Source |
Categories: Long names,